
Battery Passport Data Points Guidance, Version 4: What Changed and What to Ask
The Commission's guidance on battery passport data points is now at version 4, dated 19 November 2026. The mandatory points per category are unchanged, but linked documents now need their integrity. What changed, three questions for the 26 November webinar and what to do before February 2027.
The European Commission's "Guidance Document: Digital Batteries Passport - data points by category" is now at version 4, dated 19 November 2026. On the Commission's resources page the file kept the same name as version 3.2 of 19 October, so the only way to know which one you have is page 1.
On Thursday 26 November 2026 the Commission holds its fourth webinar on the battery passport, with a session on the data points guidance and one on the DPP Registry's API and semantic data model. This article lists what changed in version 4, three questions worth asking on Thursday, and what a battery manufacturer can do now, before the passport becomes mandatory on 18 February 2027.
What the battery passport data points guidance is
The guidance lists the 71 data points of the battery passport. For each one it gives the legal source in the Batteries Regulation, the type of access (public or restricted) and whether it is mandatory, optional, applicable only in certain cases, or not to be filled in as of February 2027, separately for EV, LMT and industrial batteries.
The guidance is not legally binding. The document says it should not be considered the Commission's official position and adds no requirement beyond Regulation (EU) 2023/1542. It is still the list to check your data against for day one.
What changed in version 4 (19 November 2026)
Version 4 lists its own changes compared with version 3:
| Data point | What version 4 says |
|---|---|
| 8, place of manufacture | "locality, region, country/jurisdiction" (version 3.2 said "town") |
| 12, chemistry | a code list plus "other" with free text |
| 17 to 23, carbon footprint, responsible sourcing and recycled content | not to be filled in or displayed as of 18 February 2027 |
| 45, instructions for use | not to be filled in or displayed as of 18 February 2027, with application "on hold pending Omnibus adoption" |
| 43 and 47 to 50, declaration of conformity, spare parts, dismantling, safety measures, test reports | web links to the documents "and corresponding integrities" |
We compared versions 3.2 and 4 row by row. The mandatory columns are the same, so the counts do not change: 45 mandatory data points for EV batteries, 48 for LMT batteries and 31 for industrial batteries. The changes make names and formats more precise.
Linked documents now need an integrity value
Five data points are documents rather than values: the EU declaration of conformity (43), part numbers and spare part sources (47), dismantling information (48), safety measures (49) and the results of test reports (50). Version 3.2 described them as a web link. Version 4 asks for the link and its "corresponding integrities".
The guidance does not say how to express that integrity. The usual way to prove that a file has not changed is a cryptographic fingerprint, such as a SHA-256 hash: if one byte of the PDF changes, the hash changes completely. The Registry's semantic data model 1.0.0, which the Commission dated 30 October 2026, describes a linked document with exactly four fields: a title, a file type, a URL and a language. It has no field for an integrity value, and it does not accept extra fields, so today a passport cannot carry one in the Registry's format.
You can prepare before the format is fixed:
- compute a SHA-256 hash of every document you link from a passport;
- give each version of a document its own URL, and never replace the file behind a link without updating its hash;
- keep documents 47 to 50 behind access control: they are restricted to persons with a legitimate interest (47 to 49) or to notified bodies, market surveillance authorities and the Commission (50).
Three questions for the Commission webinar on 26 November
1. Where does the integrity of a linked document go?
Version 4 asks for it, and the semantic model 1.0.0 has no field for it and rejects extra fields. Will the next version of the model add one, and will a SHA-256 hash be enough?
2. What happens to passports registered before semantic validation runs?
The Registry reads and validates the content at a passport's identifier. On 17 November the DPP helpdesk told us in writing that semantic validation is not operational yet, with production targeted for the end of January 2027. That leaves a few weeks before 18 February. Will passports registered earlier be validated again later? We covered how registration works in EU DPP Registry: how battery passport registration will be checked.
3. How does a recycler show legitimate interest before the access rights act?
The Commission's timeline still lists the implementing act on battery access rights for Q4 2026. Until it is adopted, data points 47 to 49 are restricted to persons with a legitimate interest without a common way to prove it. We looked at the draft in Battery passport access rights: who can see the restricted data.
What to do before 18 February 2027
- Open the guidance and check page 1: it should say Version 4, 19 November 2026.
- Map your data to version 4: place of manufacture with locality, region and country; chemistry from the code list, or "other" with a description.
- Keep a hash of every linked document and a stable URL for each version.
- Mark each data point as public or restricted, following the guidance's access column, so access rules can be switched on when the implementing act arrives.
- Leave out what does not have to be filled in on day one (points 17 to 23 and 45) and keep the data where you can find it later. Our earlier article explains what can wait until after February 2027.
At Hoken Pass our battery templates still follow version 3.2. The mandatory list is the same, and adding the integrity of linked documents is our next change. If you are comparing tools, our page on digital product passport software for SMEs and the battery passport overview explain how we approach it.
Frequently asked questions
What changed in version 4 of the battery passport data points guidance?
Version 4, dated 19 November 2026, changes the wording of data points 8 (locality instead of town), 12 (a code list plus "other" with free text), 17 to 23 and 45 (precise dates for what does not have to be filled in from 18 February 2027) and 43 and 47 to 50 (web links to the documents with their corresponding integrities).
Did the number of mandatory data points change in version 4?
No. In our row-by-row comparison with version 3.2, the mandatory data points are still 45 for EV batteries, 48 for LMT batteries and 31 for industrial batteries.
What does "corresponding integrities" mean for battery passport documents?
It means that each linked document comes with a value that proves it has not been changed, usually a cryptographic hash such as SHA-256. The guidance does not fix the format, and the Registry's semantic data model 1.0.0 has no field for it yet.
Is the data points guidance legally binding?
No. It is guidance to help economic operators apply Regulation (EU) 2023/1542, and the document says it does not add requirements. The obligations come from the Regulation itself.
When does the battery passport become mandatory?
From 18 February 2027 for EV batteries, LMT batteries and industrial batteries with a capacity above 2 kWh, under Article 77 of Regulation (EU) 2023/1542.
Sources
- European Commission, Guidance Document: Digital Batteries Passport - data points by category, Version 4 (19/11/2026)
- European Commission, Digital Product Passport: Resources and documentation (guidance and DPP Registry semantic data artifacts 1.0.0, 30/10/2026)
- European Commission, The EU Digital Product Passport for Batteries, Webinar 4 (26/11/2026)
- European Commission, Digital Product Passport (timeline)
- Regulation (EU) 2023/1542 on batteries and waste batteries, Article 77
- European Commission DPP Helpdesk, written reply to Hoken Tech (17/11/2026)
Start free: https://www.hokenpass.com